Apparel Production Management

  1. The machine requirement in detail for manufacturing 300000 pieces a month with a description of the kind of machinery?  ( 10 Marks)
  2. The total plan for the Man power in terms of cutting unit, Finishing Unit and the washing unit as well as the administration staff? ( 10 Marks)
  3. How many different production lines would you suggest provided the monthly requirement of 300000 pieces will be made in 10 different styles? ( 10 Marks) 
  1. The Production planning schedule for all 3 units for the next 6 months. ( 15 Marks)
  2. The Overtime planning divided amongst all 3 units provided that each unit works for 25 days in a month. ( Different plan for Stitching and Printing) ( 10 marks)
  3. The printing plan of unit#3 – Is it feasible to invest in additional capacity or to outsource the printing? ( 5 marks)

1. The operation break down in a stitching unit with a process flow for the following garments

4.      A. The basic 5 pocket jeans (10 Marks)

5.      B. The basic Formal single pocket shirt (10 Marks)