Apparel Production Management ARAVIND - 09901366442 – 09902787224
WE PREPARE &
PROVIDE MBA, EMBA, BMS, GDM, DMS, PGDBM, MIS, MIB , PDM CASE STUDY ANSWERS, ASSIGNMENT SOLUTIONS, PROJECT REPORTS AND THESIS
http://www.mbacasestudyanswers.com
ARAVIND - 09901366442 – 09902787224
Apparel Production Management
- The machine
requirement in detail for manufacturing 300000 pieces a month with a
description of the kind of machinery?
( 10 Marks)
- The total plan for
the Man power in terms of cutting unit, Finishing Unit and the washing
unit as well as the administration staff? ( 10 Marks)
- How many different production lines would you suggest provided the monthly requirement of 300000 pieces will be made in 10 different styles? ( 10 Marks)
- The Production
planning schedule for all 3 units for the next 6 months. ( 15 Marks)
- The Overtime
planning divided amongst all 3 units provided that each unit works for 25
days in a month. ( Different plan for Stitching and Printing) ( 10 marks)
- The printing plan of unit#3 – Is it feasible to invest in additional capacity or to outsource the printing? ( 5 marks)
1. The operation break down in
a stitching unit with a process flow for the following garments
4. A. The
basic 5 pocket jeans (10 Marks)
5. B. The
basic Formal single pocket shirt (10 Marks)

Comments
Post a Comment